Coincidental Peak Demand (CPD)

Commercial energy glossary

Coincidental Peak Demand for Commercial Electricity

Coincidental peak demand measures a site’s demand when a defined grid or zone peak occurs. That may not be the site’s largest reading. The market or tariff determines the events, method, adjustments, and any billing effect.

Compare business electricity supply

Check which peak is actually used

A rule may use one event, multiple events, or a calculated allocation. Keep the site’s own monthly demand separate from the contribution to a system peak. A single observed interval does not establish the billed value.

Fictional peak comparison
Site peak at 10 a.m.
200 kW
Defined system peak at 4 p.m.
Site draws 140 kW
Observed demand at the system peak
140 kW

Fictional times and figures, not a market-specific capacity, transmission, or billing calculation.

Check how bids allocate these costs

Request the data and calculation basis when a proposal references a coincident peak. Ask which terms are included, which can change, and why usage in the specified periods matters to the contract.