Separate Richardson office electricity from always-on equipment
A Richardson office with network or testing equipment can keep part of its electrical load running after most people leave. Identify the meter that pays for those devices, as well as the meter for shared building cooling. A central HVAC bill may belong to the landlord instead of the business.

Check your utility and supply terms
Richardson’s service-activation guide identifies Oncor for electric delivery and site readiness. Verify the serving utility, ESI ID and current retail provider for the actual account. Compare eligible meter terms without treating a service upgrade or a quote for a shared master meter as part of the tenant’s offer.
Match bids for a stable baseline and variable office use
List overnight systems, planned headcount or equipment changes and the move-in schedule. Ask about inclusions, pass-through charges, renewal and volume changes. Distinguish the right to contract for electric supply from the time needed to activate or upgrade the service.
Efficiency incentives are a separate review
Confirm equipment program eligibility or building-service questions with the provider responsible for the meter. Compare any improvement separately from the retail electricity term.
Richardson electricity supply FAQ
Can a Richardson office with part-time staffing ignore overnight usage?
No. Network equipment or climate controls can still run continuously. Review actual usage where available before sharing assumptions with retail providers.
