Use the Warren facility’s shift loads and exact address
A Warren industrial operation near the Northwest Business Park may have equipment that runs before the office opens or stays active overnight. Verify the City of Warren service address, meter and usage rather than relying on a broad Warren mailing area.

Check the actual utility and supply line
Ohio Edison documents work in the local Trumbull County service region. Confirm delivery, class and generation supplier on the actual Warren account. A county program notice does not establish a City of Warren meter’s current supply arrangement or eligibility.
Prepare a comparable business quote
Use operating and expansion dates to compare like-for-like offers. Ask which contract charges can change if equipment is added, and check that projected usage is separate from utility demand and connection charges.
Check upgrade incentives separately
Check current utility program requirements before changing motors or controls; do not treat any incentives as generation terms.
Does a Warren mailing address establish my electric program?
No. Confirm the exact location, serving utility and supply on the business account before using a program as a benchmark.
