Coincidental Peak Demand for Commercial Electricity
Coincidental peak demand measures a site’s demand when a defined grid or zone peak occurs. That may not be the site’s largest reading. The market or tariff determines the events, method, adjustments, and any billing effect.
Check which peak is actually used
A rule may use one event, multiple events, or a calculated allocation. Keep the site’s own monthly demand separate from the contribution to a system peak. A single observed interval does not establish the billed value.
- Site peak at 10 a.m.
- 200 kW
- Defined system peak at 4 p.m.
- Site draws 140 kW
- Observed demand at the system peak
- 140 kW
Fictional times and figures, not a market-specific capacity, transmission, or billing calculation.
Check how bids allocate these costs
Request the data and calculation basis when a proposal references a coincident peak. Ask which terms are included, which can change, and why usage in the specified periods matters to the contract.