Commercial energy glossary
Electricity Load Shifting for Businesses
Load shifting moves electricity use from one period to another. The same activity may use about the same kWh in the new window. An efficiency project, by contrast, can reduce total kWh without rescheduling anything.
Check the original and destination intervals
Confirm the activity can move without harming service, product quality, or safety. Check whether the new window is priced differently or creates a new demand peak. Measure whether the timing and the total usage changed.
- Before
- 250 kWh in the original window
- After
- 250 kWh in the new window
- Change in energy
- 0 kWh
Assumes equal use. The cost and demand effects depend on the actual rate and meter data.
Compare proposals using the same shifted profile
Tell bidders which changes are in effect and which are tentative. Ask whether the price varies by hour. A schedule change can matter under a utility tariff without affecting a flat commodity price.
